Climate reporting · United Arab Emirates

The number is easy. The evidence is the work.

We build the emissions inventory, the evidence file and the filing support for UAE companies — collected from the people who actually hold the numbers, cited line by line, in Arabic and English.

Dubai-based · DET licence 1615132 Arabic and English We sell no credits


01 — Why now

Four dates your company is already inside.

None of this is speculative. Each date below is published, and each one moved a reporting obligation closer to an ordinary operating company.

30 May 2025

The law came into force

Federal Decree-Law 11/2024 applies to operating companies with no blanket size threshold, free zones included. Penalties run from AED 50,000 to AED 2,000,000.

30 May 2026

The first reports were due

MOCCAE signalled a possible extension before that date and has not published a revised one. The deadline moved in conversation; the file still has to exist.

1 January 2026

CBAM became definitive

If you export to the EU, your importer now owes on embedded emissions — and needs your numbers. Voluntary credits cannot be used against them.

2027

Scope 3 arrives

Corporate buyers and banks already send supplier questionnaires with emissions questions attached. Answering once, with evidence, is cheaper than answering badly.

Regulatory position as published in November 2026. Confirm current requirements with MOCCAE or your legal adviser before filing.


02 — The work

An inventory is a chain of custody.

Anyone can put a number in a spreadsheet. The value is in being able to hand a stranger the invoice, the meter reading and the factor that produced it — quickly, and without a scramble.

So we build backwards from the auditor: every reported line points to a source document, and every factor points to a published reference. If a figure cannot be traced, it does not go in the report.

Every file contains

  • Boundary map — mainland, free zone and EEZ operations as separate lines, not one group number.
  • Source register — every meter, invoice, delivery note and service record, with who holds it.
  • Factor register — IPCC 2006 with 2019 refinements, or the local factor where one exists, cited to source.
  • Evidence index — one column that lets a verifier walk from any figure to the document behind it.
  • Reduction plan — one costed measure, with the saving in tCO₂e and in dirhams.
  • Board summary — two pages, Arabic or English, that a director can actually read.
Source DEWA bill · July On file
Activity 41,280 kWh Reconciled
Factor 0.4046 kgCO₂e/kWh Cited
Reported 16.7 tCO₂e Scope 2

The factor shown is illustrative. Your file uses the factor that applies to your emirate, supplier and year, and names it.

We are not a verifier. We do not sign your emissions figure. We make the file defensible for whoever does.

We are not a software subscription. You are buying a completed file from a person who chases your site supervisor, not a login.


03 — Pricing

Four lines. Published prices.

Every figure below is the price. No discovery phase that becomes a programme, no per-seat licence, no annual uplift written into a proposal.

01 Carbon inventory & filing

The core engagement.

Three weeks to a submission-ready pack, then a monthly rhythm so next year is maintenance rather than a rebuild.

  • Scope 1 and 2 inventory, with the organisational boundary mapped
  • Evidence vault: invoices, meters, delivery notes, service records
  • MRV / IEQT registration and submission support
  • Reduction plan with one costed measure, plus annual re-filing
AED 7,500setup · single site, up to 100 staff · then AED 750 / month
AED 14,000setup · up to five entities · then AED 1,500 / month

You supply utility and fuel data; we chase, reconcile and flag gaps.

02 Buyer data desk

For the questionnaires that arrive unannounced.

A buyer sends a supplier form with emissions questions. We take the form, find the evidence and draft the answer — from the same index as your filing.

  • Question-by-question tracker per buyer
  • Answers reuse the same evidence, so numbers stay consistent
  • Scope 3 where we can answer it from your suppliers' data
AED 1,200per month · up to 3 questionnaires
AED 500each additional questionnaire

Standalone, or attached to line 01.

03 Offset procurement advisory

Advice that can say no.

Registry check, methodology, vintage, retirement. You contract with and pay a licensed supplier directly — we never hold credits or client money.

  • Shortlist with registry and methodology checked, not just price
  • Written view on whether offsetting is the right instrument for your claim
  • Retirement documentation you can show a buyer or auditor
AED 2,500per procurement · plus 5% disclosed sourcing fee, minimum AED 1,000

We will also tell you when buying credits is the wrong move.

04 Project origination support

For developers who need the file to survive verification.

Monitoring plans, data pipelines and evidence packs for Verra, Gold Standard or PACM documentation — built to be checked, not just to look complete.

  • Monitoring plan and the data pipeline behind it
  • Evidence pack assembled to the standard's own document list
  • First-year data collection run with your site team
From AED 18,000per milestone · from AED 35,000 for a full monitoring build

Scoped after a boundary call, before any invoice.

Prices hold to 31 March 2027 and exclude VAT. Third-party verification fees, credit purchases and legal advice are billed by those parties, not by us.


04 — Process

Three weeks, then a rhythm.

The only unusual thing about the timetable is that it is short. Most of the elapsed time is other people finding documents, so we start that hunt on day one.

Week 1

Boundary and data map

We list every emission source, who holds the record, and what format it is in. You get the list of what is missing before we build anything.

Week 2

Collection

Staff submit through WhatsApp or a one-page form. We reconcile against invoices and utility bills, and flag the gaps that would fail an audit.

Week 3

Inventory and file

Figures calculated, factors cited, evidence indexed. Registration and submission support, then the pack and the board summary.

Ongoing

Monthly rhythm

Meter and fuel updates, buyer questionnaires as they arrive, and annual re-filing without starting from zero.

Who this is for

Clinics & medical centres Restaurant groups Warehouses & logistics Light manufacturing Real estate & facilities Professional services Exporters to the EU

What we will not take on

Groups with tangled entity boundaries. If the legal structure needs a lawyer before it needs an inventory, we say so and step back.

Anyone asking for "carbon neutral certification". We are not a certifier, and claims in this area are tightening rather than loosening.

Anyone asking us to sign the emissions figure. That signature belongs to an accredited verifier.

Credit trades where we hold stock or money. Advisory only, always.

Why the prices are published

Because a buyer comparing consultancies should be able to see the number before the meeting. Our position sits below a carbon-software subscription at the small end and above the cost of an ISO 14001 certificate — because this is a filing, not a badge.

Fixed scope, fixed fee, and a written list of what is excluded before you commit.


05 — Questions

The honest answers.

We are only forty staff. Does this apply to us?

The federal law sets no blanket size threshold, so most operating companies are in scope. Whether the ministry calls your file first is a separate question. We build the inventory so you are ready either way.

Our accountant already handles reporting.

Good. We supply the evidence file and the emissions inventory; your accountant or an accredited verifier signs. We work under them, not instead of them.

Is the deadline real? I heard it moved.

First reports were due 30 May 2026 under Federal Decree-Law 11/2024. MOCCAE indicated a possible extension before that date and has not published a revised one. We are not selling urgency — the file is built so you can file within days, and answer a buyer who asks this quarter.

Can it be Arabic only?

Yes. The report, the staff forms and the board summary can be Arabic only; the underlying evidence stays bilingual so a verifier can follow it.

Do you sell carbon credits?

No. We advise on procurement and you contract directly with a licensed supplier. That is deliberate: it means our answer to "should you buy credits at all" is not conflicted.

What if our data is a mess?

It usually is. Week one is designed for that. If the boundary is too tangled or the records do not exist yet, we say so before you pay, and tell you what to fix first.

Next step

Twenty minutes, six questions.

Tell us your sites, your utilities and who holds the records. If you are in scope, we can start inside five working days. If you are not, we will say so on the call.

Dubai · Sunday to Thursday, 9am–6pm GST Prices in plain text

Bring one utility bill and one fuel or refrigerant record to the call. It is enough to tell you whether your data is filing-ready, roughly what your Scope 1 and 2 look like, and where the gaps will be.